top of page

building SERVICES.

      project ONE. 

 

Learning Outcome of this Project

 

On completion of this assignment, students will be able to:

1. Identify and understand relevant information related to water and electrical supply, sewerage, mechanical ventilation and air-conditioning as well as fire protection systems.

2. Understand how each building services functions including the connections and position of different parts equipment.

3. Understand and explain the principles and systems as well as space implications and regulations related to different building services.

 

Tasks - Methodology

 

Form a group of between 5 to 6 students in the same tutorial group.

Under the tutelage of a lecturer, each group is required to choose a building of at least 4-storey high which can be either public or commercial buildings (i.e. office blocks, institutional buildings, shopping malls, etc.). 

Each group is to perform a thorough study and analysis of the following services systems associated to the building:

i. water supply system

ii. electrical supply system

iii. sewerage, sanitary & drainage system

iv. mechanical transportation system

v. mechanical ventilation and air-conditioning system

vi. fire protection system

 

Objectives of Project

 

The objectives of this assignment are as follows:

1. To introduce students to the basic principles, process and equipment of various building services systems through real life project (experiential learning).

2. To expose students to the integration of various building services systems in a building.

3. To allow students to demonstrate their understanding of building services systems

4. To develop students’ understanding and familiarity on the drawing conventions and standards for different building services systems 

 

 

 

 

 

  • Tumblr Social Icon

© 2013 by Lee Qin Ni. Proudly created with Wix.com

bottom of page