building construction TWO.

              project TWO. 

 

 

The objectives of this project are as follows:

 

* To create an understanding of solid structure and surface structure and its relevant structural components.

* To understand how a solid structure and surface structure reacts under loading.

* To demonstrate a convincing understanding of how Solid Construction and surface construction works.

* To exploit the qualities inherent in Solid Construction and surface construction.

* To be able to manipulate Solid Construction and surface construction to solve an oblique Design problem.

 

Learning outcomes assessed in this project include:

* Identifications of basic structural systems in construction

* Differentiate skeletal, solid and surface construction systems in terms of loads and forces acting on structural elements.

* Recognize and apply the implications of construction system in design.

* Analyse the issues of strength, stiffness and stability of structures including modes of structural systems, forces, stress and strain and laws of static.

[click image to enlarge]

PERSPECTIVE.

PERSPECTIVE.

the construction of this is divided into two parts:- a) skeletal construction system b) solid construction system we made this model using plastic model sticks with various length(s) and diameter(s). through this project, I further understood the construction system used in building the cinema center. our extensive research has deepen my knowledge not only in skeletal construction system, but also how a genius masterpiece can be built with the advancement of current technology.

BASE.

BASE.

the base is made of concrete. (solid construction system)

ROOF.

ROOF.

top view of the roof and double cone structure.

ROOF TRUSSES.

ROOF TRUSSES.

ROOF TRUSSES.

ROOF TRUSSES.

SUSPENDED CORRIDOR.

SUSPENDED CORRIDOR.

ELEVATION A.

ELEVATION A.

ELEVATION B.

ELEVATION B.

ELEVATION C.

ELEVATION C.

ELEVATION D.

ELEVATION D.

JOINTS SYSTEM.

JOINTS SYSTEM.

a close up view of the joints system. the construction of BUSAN CINEMA CENTER's roof is mainly nuts and bolts system.

GROUP MATES.

GROUP MATES.

C.I.P.

C.I.P.

construction in progress.

C.I.P.

C.I.P.

construction in progress.

C.I.P.

C.I.P.

construction in progress.